Swift Creek Jan 2024 - July 2025
After the end of the 2023-2024 school year, in June, the school will move from the current building at 5601 Tryon Road to a new temporary space. (Current Swift Creek will be torn down in the summer of 2024). We had an open house of the temporary space in May 2023. Current and future families came to visit and see the space.
As the pictures below show, this campus has a large main building, three modular units, and 2 playgrounds.
As the pictures below show, this campus has a large main building, three modular units, and 2 playgrounds.
Main school building
School parking lot and carpool area
Behind the main building
Behind Module 1
Second playground which is next to Module 3
|
Playground between the main building and modular units. A covered walkway exists between the main building and the modular units.
Module 1
Module 2
Module 3
|
Directions from Swift Creek:
And you're there! From the school, the trip should take about 13 minutes. NOTE: These are the directions from Swift Creek Elementary School. Use Google Maps to discover the best route from your house. Here is a screenshot from Google maps. Please note that it lists the location as Fuller Magnet Elementary, which is the last school to use this space. They are now in their new buidling.
|
Inside the main building